Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Want repeat work? See the builders pulling the most permits →
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Blk 10-104. Repeat of Model TCBB1910 (26-011481). Construction of a 3-storey back-to-back…
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Blk 10-105 Repeat of Model TCBB1912 (26-011483). Construction of a 3-storey back-to-back…
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Blk 10-106. Repeat of Model TCBB1910 (26-011481). Construction of a 3-storey back-to-back…
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Blk 10-107. Repeat of Model TCBB1912 (26-011483) Construction of a 3-storey back-to-back…
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Blk 10-108. Repeat of Model TCBB1910 (26-011481) Construction of a 3-storey back-to-back…
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Blk 1-142 Model: TADF2023C-ARU, Elev B. Construction of a 3-storey dual-front townhome…
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Blk 1-143 Repeat of Model TADF2021 (26-017107). Elev. B. Construction of a 3-storey…
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Blk 1-144 Repeat of Model TADF2022E (26-017102). Elev. B. Construction of a 3-storey…
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: HVAC equipment mentioned
Replace existing curved stairs with new u-shaped stairs. Increased size of proposed…
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Repeat of 25-113153 - Construction of a new two storey single detached dwelling. Model…
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Repeat of 25-120996 - Construction of a new two storey single family detached dwelling.…
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Repeat of 25-115497 - Construction of a new two storey single family detached dwelling.…
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Repeat of 25-120392 - Construction of a new two storey single family detached dwelling.…
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Repeat of 25-111863 - Construction of a new two storey single detached dwelling. Model -…
Oakville · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Repeat of 25-120392 - Construction of a new two storey single family detached dwelling.…
Toronto · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Proposed new garden suite.
Toronto · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Proposal to construct a new two storey laneway suite.
Toronto · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposal for a rear third storey addition and renovation of 2nd floor existing bathrrom.
Toronto · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Proposal to demolish existing SFD to construct new three storey detached houseplex (4…
Toronto · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: Additions need HVAC extended to new space
Rear addition to the main floor and secondf floor, a rear deck and interior alterations.
Toronto · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposal for a 3-storey addition to an existing 3-storey SFD with a front porch, a rear…
Toronto · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: Additions need HVAC extended to new space
Addition of second floor and third floor to existing house, interior alteration of…
Toronto · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
2 STOREY REAR GARDEN SUITE
Toronto · Issued Oct 7, 2026 · 30 days ago
Why it’s a lead: New dwelling needs a full HVAC system
NEW SINGLE FAMILY DWELLING WITH SECOND UNIT IN THE BASEMENT (DUPLEX)See also 26 165…