Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Want repeat work? See the builders pulling the most permits →
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Toronto · Issued Oct 14, 2026 · 23 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposal for multiple projects including underpinning, interior alterations, 1 storey…
Toronto · Issued Oct 14, 2026 · 23 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Proposal for Garden suite
Toronto · Issued Oct 14, 2026 · 23 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposed rear addition and one storey addition above the existing detached house, with a…
Toronto · Issued Oct 14, 2026 · 23 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposed rear addition, underpinning, interior alterations, and rear deck.
Toronto · Issued Oct 14, 2026 · 23 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposal for 3-storey addition and proposed interior alterations and underpinning.
Vaughan · Issued Oct 14, 2026 · 23 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Proposed detached single family dwelling -Model-4501 A -Elevation A -Ground Floor…
Cambridge · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Residential Building: Duplex/Two Unit House, new
Cambridge · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Residential Building: Duplex/Two Unit House, new
Kitchener · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: New dwelling needs a full HVAC system
A new Dalton single detached dwelling with an attached garage.
Kitchener · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: New dwelling needs a full HVAC system
A new Dundee D30C single detached dwelling with an attached garage. (elevation MK)
Mississauga · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Additions need HVAC extended to new space
2nd storey heated addition above garage
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Proposal to construct a new two storey Garden Suite.(applicant will be submitting revised…
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposal for rear addition on second floor.
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposed two storey addition in rear yard
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposed rear one storey addition and rear deck
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: New dwelling needs a full HVAC system
NEW 3-STOREY DETACHED SFD WITH INTEGRAL GARAGE (22.74 SQM) AND FINISHED BASEMENT…
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposal for a rear 2 storey addition and interior alterations
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Proposed a new two-storey detached ancillary building containing a two-unit laneway suite…
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposal for interior alteration to existing dwelling, second storey addition, removal of…
Vaughan · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Additions need HVAC extended to new space
Addition of Sunroom on rear side of the building
Oakville · Issued Oct 10, 2026 · 27 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposed attached Garage addition and front covered porch
Oakville · Issued Oct 10, 2026 · 27 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Blk 18-92. Lot Specific: model A1802 Aspen-Ele B2, 3 storey standard common element…
Oakville · Issued Oct 10, 2026 · 27 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Blk 18-93, model A1700 Glen Abbey - elev. A1, A2, B1 & B2: 3 storey stand common…
Oakville · Issued Oct 10, 2026 · 27 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Blk 18-94, REPEAT of model A1700 Glen Abbey (26-020453) elev. A1, A2, B1 &B2: 3…