Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Want repeat work? See the builders pulling the most permits →
Loading permits…
Permits at the stage when windows & blinds work usually starts.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data
Toronto · Issued Jan 5, 2026 · 10 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Three storey townhouse with rooftop terrace, Unit W2
Toronto · Issued Jan 5, 2026 · 10 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal to construct a garden suite.
Toronto · Issued Jan 5, 2026 · 10 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal to construct new 2 storey Laneway Suite
Toronto · Issued Jan 2, 2026 · 10 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal to construct new two storey four unit (Multiplex). Note: Graden suite proposed under #25 248549 BLD 00 SR
Toronto · Issued Jan 2, 2026 · 10 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
The Applicant is proposing to demolish the existing dwelling and construct a 253.6 m2 (2,730 ft2) 2-storey detached dwelling.
Toronto · Issued Jan 2, 2026 · 10 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal to construct a new one-storey front addition, a two-storey west side addition, reconfigure/ rebuild roof over existing second storey and a new front covered porch.
Burlington · Issued Dec 31, 2025 · 10 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Single Detached Dwelling: New
Toronto · Issued Dec 31, 2025 · 10 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposed new construction of 4 unit detached dwelling (fourplex)
Toronto · Issued Dec 31, 2025 · 10 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
PROP. NEW 2 STY GARDEN SUITE
Mississauga · Issued Dec 30, 2025 · 10 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
New garden suite in rear yard
Kitchener · Issued Dec 29, 2025 · 10 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
A new back to back duplex dwelling with finished basement.
Toronto · Issued Dec 29, 2025 · 10 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal for a garden suite.
Oakville · Issued Dec 24, 2025 · 11 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Repeat of 25-115497 - Construction of a new two storey single family detached dwelling. Model - C38G Windfield - Elevation CN: 4bdrm with attached garage, covered porch. Options: The Next Step, Third Bath, Vaulted Ceiling w/High Level Windows, Raised Ceiling Alternate Primary Bedroom. Geothermal HVAC systems. 2024 BUILDING CODE
Toronto · Issued Dec 24, 2025 · 11 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal to demolish existing dwelling and construct a new two storey dwelling with secondary suite in basement.
Toronto · Issued Dec 24, 2025 · 11 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal for a new 2 storey 2 Unit-Detached.
Toronto · Issued Dec 24, 2025 · 11 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposall to construct a new two-storey garden suite.
Toronto · Issued Dec 24, 2025 · 11 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal to demolish existing 1 1/2 storey single detached dwelling. Proposal to construct a two storey single detached dwelling with underground parking.
Toronto · Issued Dec 24, 2025 · 11 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposed new Laneway Suite in Rear of Property over existing garage
Toronto · Issued Dec 24, 2025 · 11 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal to demolish existing single family dwelling and construct a new three storey four unit Houseplex, with 2 front main floor entry porches, 1 Rear main floor entry porch + Front and Rear 3rd floor balconies.Rear yard garden suite (25 245185 BLD 00 NH).
Toronto · Issued Dec 24, 2025 · 11 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal to construct a new one-storey rear addition, a covered front porch, a rear yard deck and a detached garage in the rear yard. Taken in as a New House by Renovation.
Toronto · Issued Dec 24, 2025 · 11 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposed two storey laneway suite at the rear of the property.
Toronto · Issued Dec 24, 2025 · 11 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal to construct a new two unit, three storey dwelling with a detached garage.
Cambridge · Issued Dec 23, 2025 · 11 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
Residential Building: Single Detached, new
Mississauga · Issued Dec 23, 2025 · 11 months ago
⏱ Likely ready now
Why it’s a lead: Nobody moves into a new home with bare windows
New shed in rear yard