Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Want repeat work? See the builders pulling the most permits →
Loading permits…
Permits at the stage when landscaping work usually starts.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Toronto · Issued Jul 15, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposed multiple projects to include ground-floor & second-floor interior alterations,…
Toronto · Issued Jul 15, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
To construct a two storey rear addition including basement addition, third floor balcony,…
Toronto · Issued Jul 15, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Landscaping or hardscape mentioned
Proposed removal and recontruction of retaining wall - See 81 Ivy Ave 26 198013SR
Vaughan · Issued Jul 15, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Addition to the side of the existing dwelling
Brampton · Issued Jul 14, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Single Family Detached: Addition - Complete
Oakville · Issued Jul 14, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Addition of a rear patio roof. There are no changes proposed to any existing glazing.
Toronto · Issued Jul 14, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposal to construct a three storey rear addition plus a two storey addition above the…
Toronto · Issued Jul 14, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposal for new second storey addition over existing dwelling, new attached garage, new…
Toronto · Issued Jul 14, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposed interior renovations that includes addition of 2 consultation rooms, staff room…
Toronto · Issued Jul 14, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposal to constructing a rear two-storey addition by demolishing existing rear…
Toronto · Issued Jul 14, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposed Third Storey Rear AdditionInterior alteration
Toronto · Issued Jul 14, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposed 2nd floor addition and interior alterations to existing single family dwelling
Toronto · Issued Jul 14, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposal for minor exterior alterations to this existing detached SFD. Work includes…
Toronto · Issued Jul 14, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
To alter the existing three-storey semi-detached dwelling by constructing a front…
Burlington · Issued Jul 13, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Single Detached Dwelling: Addition
Kitchener · Issued Jul 13, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
A sunroom addition to the rear of a single detached dwelling
Mississauga · Issued Jul 13, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
2nd flr addition in rear yard w/ covered porch & ground flr side addition w/ interior…
Toronto · Issued Jul 13, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Construction of proposed rear and side extensios to the existing first floor, and a…
Toronto · Issued Jul 13, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
PROPOSED 2ND STY. REAR SIDE ADDITION OVER EXISTING FOOTPRINT, PROPOSED UNDERPINNING,…
Toronto · Issued Jul 13, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposal for a ground floor and second floor addition.
Toronto · Issued Jul 13, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Landscaping or hardscape mentioned
Proposed removal and recontruction of retaining wall - See 33 Ivy Ave 26 198030SR
Oakville · Issued Jul 11, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Revision to Permit - to change the description on the original permit to reflect this as…
Kitchener · Issued Jul 10, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Converting the garage to a heated living area at a semi-detached dwelling
Mississauga · Issued Jul 10, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Int alts on grnd flr of exist sfd fin bsmt demo & rebuild 2nd storey & new (1) storey…