Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Additions tie into the existing roof
Proposed 3rd floor addition to an existing two storey semi detached with a rear balcony
Vaughan · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
New Subdivision home EP-26 120181 finished basement=284.58 m2 first floor=286.31…
Vaughan · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Roof, dormer or storey addition
Construction of a new attached flat roof canopy over rear walkout patio area
Vaughan · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Roof, dormer or storey addition
Roof mounted solar panel installation
Brampton · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Additions tie into the existing roof
Single Family Detached: Addition - Complete
Burlington · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Additions tie into the existing roof
Single Detached Dwelling: Addition
Burlington · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Additions tie into the existing roof
Single Detached Dwelling: Addition
Burlington · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Additions tie into the existing roof
Single Detached Dwelling: Addition
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A new The Wellesley Corner NTHF rowhouse unit. (Block 3 - Lot 14/elevation CR)
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A new The Berlin NTHA rowhouse unit. (Block 3 - Lot 15/elevation CR)
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A new The Cranbrook NTHB rowhouse unit. (Block 3 - Lot 16/elevation CR)
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A new The Berlin NTHA rowhouse unit. (Block 3 - Lot 17/elevation CR)
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A new The Millbank End NTHC rowhouse unit. (Block 3 - Lot 18/elevation CR)
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Additions tie into the existing roof
A porch at the single detached dwelling
Mississauga · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Roof, dormer or storey addition
(1) storey rear add. W/ increase in building height front & rear porches int. Alts.…
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal to construct a two storey laneway suite in the rear yard. See related ZAP Folder…
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal to convert existing garage into a garden suite with an integral garage.
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
New Garden Suite, Fourplex has a separate permit
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal to demolish existing dwelling and construct a three-storey sixplex with two…
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal to construct a 4-unit houseplex.
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Additions tie into the existing roof
Proposed 3rd Floor Rear Addition (31.00 m2), Proposed Re-Build of Existing Front Porch…
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Additions tie into the existing roof
PROPOSED 2 STOREY ADDITION (78.03m2) with rear deck, and lowering of basement and…
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal to demolish existing dwelling and construct a new single family detached…
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Additions tie into the existing roof
Proposed two-storey rear addition and interior alterations to an existing two-storey…