Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
Proposal to convert existing garage into a garden suite with an integral garage.
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
New Garden Suite, Fourplex has a separate permit
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New home — builders usually stop at sod
Proposal to demolish existing dwelling and construct a three-storey sixplex with two…
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New home — builders usually stop at sod
Proposal to construct a 4-unit houseplex.
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Construction access wrecks the yard
Proposed 3rd Floor Rear Addition (31.00 m2), Proposed Re-Build of Existing Front Porch…
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Construction access wrecks the yard
PROPOSED 2 STOREY ADDITION (78.03m2) with rear deck, and lowering of basement and…
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New home — builders usually stop at sod
Proposal to demolish existing dwelling and construct a new single family detached…
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Construction access wrecks the yard
Proposed two-storey rear addition and interior alterations to an existing two-storey…
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New home — builders usually stop at sod
PROPOSED TO DEMOLISH EXISITING DWELLING AND NEW CONSTRUCTION OF 2 STOREY SINGLE FAMILY…
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Construction access wrecks the yard
Proposal for rear addition at second floor level and interior alteration at basement, 1st…
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New home — builders usually stop at sod
Proposal to demolish existing detached garage and construct a new detached garage
Waterloo · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New home — builders usually stop at sod
Construct a new 2 Storey single detached dwelling - 4 Bedroom - unfinished basement with…
Waterloo · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New home — builders usually stop at sod
Construct a new 2 Storey single detached dwelling - 4 Bedroom - unfinished basement with…
Waterloo · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New home — builders usually stop at sod
Single detached 3 storey dwelling with front porch, finished basement with gym, movie…
Oakville · Issued Oct 24, 2026 · 12 days ago
Why it’s a lead: New home — builders usually stop at sod
Proposal to construct 2-storey single family detached, attached garage, unfinished…
Kitchener · Issued Oct 23, 2026 · 13 days ago
Why it’s a lead: New home — builders usually stop at sod
A new Linwood D30D single detached dwelling with an attached garage. (Elevation CR)
Kitchener · Issued Oct 23, 2026 · 13 days ago
Why it’s a lead: New home — builders usually stop at sod
A new D36C Elmbank Corner single detached dwelling with an attached garage. (Elevation TA)
Kitchener · Issued Oct 23, 2026 · 13 days ago
Why it’s a lead: New home — builders usually stop at sod
A new Dalton Y30A single detached dwelling with an attached garage. (Elevation A)
Kitchener · Issued Oct 23, 2026 · 13 days ago
Why it’s a lead: Construction access wrecks the yard
A new deck with stairs in the rear yard of a single detached dwelling
Oakville · Issued Oct 23, 2026 · 13 days ago
Why it’s a lead: New home — builders usually stop at sod
Lot 59. REPEAT of model Marquis 7 (26-002810), ele 1. Construction of a single detached 2…
Oakville · Issued Oct 23, 2026 · 13 days ago
Why it’s a lead: New home — builders usually stop at sod
Repeat of 25-111863 - Lot 27 Construction of a new two storey single detached dwelling.…
Oakville · Issued Oct 23, 2026 · 13 days ago
Why it’s a lead: New home — builders usually stop at sod
Repeat of 25-108189 - Lot 28 Construction of a new two storey single detached dwelling.…
Toronto · Issued Oct 23, 2026 · 13 days ago
Why it’s a lead: New home — builders usually stop at sod
Proposed demolition of exisiting single family residential building and construction of a…
Toronto · Issued Oct 23, 2026 · 13 days ago
Why it’s a lead: Construction access wrecks the yard
2ND STOREY ADDITION TO EXISTING ONE STOREY DWELLING AND TWO STOREY ADDITION AT REAR YAR…