Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Kitchener · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New homes typically add a rear deck or patio
A new The Trussler ITHE rowhouse dwelling unit with a finished basement. (Block 6 - LOT…
Kitchener · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New homes typically add a rear deck or patio
A new The Cranbrook ITHB rowhouse dwelling unit. (Block 6 - LOT 49/ elevation TA-1)
Kitchener · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New homes typically add a rear deck or patio
A new The Cranbrook ITHB rowhouse dwelling unit. (Block 6 - LOT 50/ elevation TA-1)
Kitchener · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New homes typically add a rear deck or patio
A new The Millbank End ITHC rowhouse dwelling unit. (Block 6 - LOT 51/ elevation TA-1)
Kitchener · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New homes typically add a rear deck or patio
A new Oxford D30E single detached dwelling with an attached garage. (Elevation MK)
Kitchener · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Deck, porch or patio work
A new roof over the existing front porch and attached garage at a single detached dwelling
Mississauga · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New homes typically add a rear deck or patio
(2) storey detached dwelling w/ finished basement
Mississauga · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New homes typically add a rear deck or patio
Revision to bp 25-10351 - fire damage restoration rebuild superstructure & rear yard…
Oakville · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New homes typically add a rear deck or patio
Lot 45. Model 3501(Kingsford) Corner,Elev. A, B, C. Const. of a two stry single detached…
Oakville · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New homes typically add a rear deck or patio
Lot 49. REPEAT of Model O28-4 (26-026601) Elevation A. Const. 4 bdrm, 2 stry SFD, unfin…
Oakville · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New homes typically add a rear deck or patio
Repeat of 25-113153 - Construction of a new two storey single detached dwelling. Model…
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New homes typically add a rear deck or patio
Proposal to construct 2 storey SFD with attached garage, finished basement and walkout
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Deck, porch or patio work
Propose to legalize one storey rear addition, front porch stairs, creation of two unit…
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Deck, porch or patio work
Proposed interior alterations to allow a four plex residential ,underpin existing…
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Pools usually get a deck or patio surround
Proposal to construct a two-level rear addition to the existing dwelling, including a…
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Deck, porch or patio work
Proposed demolition of the existing front porch and construction of a new front porch and…
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Deck, porch or patio work
PROPOSED FRONT PORCH REPLACEMENT AND JULIET BALCONY ON THE SECOND FLOOR.26-259521 BLD 00…
Vaughan · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New homes typically add a rear deck or patio
New Subdivision home EP-26 120181 finished basement=284.58 m2 first floor=286.31…
Vaughan · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Deck, porch or patio work
Construction of a new attached flat roof canopy over rear walkout patio area
Burlington · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Deck, porch or patio work
Attached Deck: New
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New homes typically add a rear deck or patio
A new The Wellesley Corner NTHF rowhouse unit. (Block 3 - Lot 14/elevation CR)
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New homes typically add a rear deck or patio
A new The Berlin NTHA rowhouse unit. (Block 3 - Lot 15/elevation CR)
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New homes typically add a rear deck or patio
A new The Cranbrook NTHB rowhouse unit. (Block 3 - Lot 16/elevation CR)
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New homes typically add a rear deck or patio
A new The Berlin NTHA rowhouse unit. (Block 3 - Lot 17/elevation CR)