Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Waterloo · Issued Nov 2, 2026 · 2 days ago
Why it’s a lead: New home — builders usually stop at sod
Units 16-18 - 3 townhouse units on a private road
Cambridge · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New home — builders usually stop at sod
Residential Building: Single Detached, new
Cambridge · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New home — builders usually stop at sod
Residential Building: Single Detached, new
Mississauga · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: Pool installs leave the yard torn up
New (1) storey pool cabana & pergola in rear yard w/ attached shed including new rear deck
Mississauga · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New home — builders usually stop at sod
(2) storey detached dwelling with finished basement
Mississauga · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New home — builders usually stop at sod
(2) storey detacehd dwelling with finished basement
Mississauga · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New home — builders usually stop at sod
New (2) storey detached dwelling w/ fin bsmt bsmt walkout and rear yard covered patio
Oakville · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New home — builders usually stop at sod
Lot 48-REPEAT of Model C38B (25 120392), Elev CN. Construction of two storey single…
Toronto · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: Construction access wrecks the yard
Proposed new extension structure to house. A new 2 pc washroom and corridor.
Toronto · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New home — builders usually stop at sod
PROPOSED RESIDENTIAL FOURPLEX(BASEMENT+3 STOREY)
Toronto · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: Construction access wrecks the yard
Interior alterations to an existing detached dwelling, including demolition of an…
Toronto · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
NEW LANEWAY SUITE TO BE CONSTRUCTED IN REAR YARD, EXISTING DWELLING TO REMAIN UNALTERED.
Toronto · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: Construction access wrecks the yard
New unheated enclosed front porch cover
Toronto · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: Construction access wrecks the yard
New rear yard 10.77 s.m. second storey addition over existing first floor.New front yard…
Toronto · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
New Garden Suite
Toronto · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New home — builders usually stop at sod
Construct a two storey dwelling with an attached garage, front and rear covered porch
Toronto · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: Construction access wrecks the yard
Proposal for two storey addition with basement and underpinning. New washroom in basement…
Toronto · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: Construction access wrecks the yard
Proposal to construct a new addition over existing attached garage and interior…
Toronto · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: Construction access wrecks the yard
Proposed interior alterations (405 sqm), rear second floor addition (37 sqm) and basement…
Toronto · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New home — builders usually stop at sod
Proposal to demo existing shed to construct a new detached garage in the rear yard.
Burlington · Issued Oct 29, 2026 · 6 days ago
Why it’s a lead: Construction access wrecks the yard
Single Detached Dwelling: Addition
Cambridge · Issued Oct 29, 2026 · 6 days ago
Why it’s a lead: Construction access wrecks the yard
Residential Alteration: Single Detached, addition/renovation
Kitchener · Issued Oct 29, 2026 · 6 days ago
Why it’s a lead: Construction access wrecks the yard
Partial removal of the second floor to build a new second floor addition and for interior…
Kitchener · Issued Oct 29, 2026 · 6 days ago
Why it’s a lead: New home — builders usually stop at sod
A new Oxford D30E single detached dwelling with an attached garage. (Elevation TA)