Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Kitchener · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: New home — builders usually stop at sod
A new Bodhi rowhouse with an attached garage. (Block D - Unit 22)
Kitchener · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: New home — builders usually stop at sod
A new Bodhi rowhouse with an attached garage. (Block D - Unit 23)
Kitchener · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: New home — builders usually stop at sod
A new Olivia rowhouse with an attached garage. (Block D - Unit 24)
Kitchener · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Construction access wrecks the yard
A 1 storey addition in the rear yard and for alterations to repair the existing basement…
Kitchener · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Construction access wrecks the yard
A new deck with stairs in the rear yard serving unit #1 of a duplex dwelling
Kitchener · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Construction access wrecks the yard
A deck at the rear of a single detached dwelling
Mississauga · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Construction access wrecks the yard
Basement & ground flr add in rear yard 2nd flr add garage front expansion (1) new…
Mississauga · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Construction access wrecks the yard
2nd storey addition to existing interior alterations on ground floor & finished basement
Oakville · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Construction access wrecks the yard
Proposed second-floor addition including a new bedroom, ensuite, and washroom. Interior…
Toronto · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
Proposal to construct a 3 storey Fourplex with a garden suite in the rear.(Refer to 26…
Toronto · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
TO CONSTRUCT A NEW TWO STOREY GARDEN SUITE
Toronto · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Construction access wrecks the yard
Proposal to construct rear addition with interior alterations.
Toronto · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Construction access wrecks the yard
Proposed first floor addition, third floor addition and new third floor balcony.
Toronto · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
Proposal to demolish existing building and construct a new three storey four unit…
Toronto · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Landscaping or hardscape mentioned
proposed rear tw-storey addition (with basement), a front basement addition under the…
Toronto · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
NEW 2-STOREY GARDEN SUITE
Toronto · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Construction access wrecks the yard
EXTENSION OF THE 3RD FLOOR AT THE REAR (67.54 sq.m)
Toronto · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
Proposed 2 storey garden suite
Toronto · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Landscaping or hardscape mentioned
REPLACEMENT OF EXISTING WOOD LANDSCAPING STEPS WITH NEW STONE STEPS (FRONT…
Toronto · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Construction access wrecks the yard
CONSTRUCTION OF A ONE-STOREY ADDITION ABOVE THE REAR PORTION OF THE EXISTING ONE-STOREY…
Toronto · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Landscaping or hardscape mentioned
Retaining wall construction.
Toronto · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Landscaping or hardscape mentioned
Proposal to relocate rear retaining wall to gain two parking spaces.
Waterloo · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: Construction access wrecks the yard
Creation of a two bedroom secondary dwelling unit in the basement of a single detached…
Burlington · Issued Oct 7, 2026 · 29 days ago
Why it’s a lead: Construction access wrecks the yard
Single Detached Dwelling: Addition