Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A Ethan rental rowhouse with an attached garage. (Block G)
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A Krishna rental rowhouse with an attached garage. (Block G)
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A Krishna rental rowhouse with an attached garage. (Block G)
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A Krishna rental rowhouse with an attached garage. (Block G)
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A Krishna rental rowhouse with an attached garage. (Block G)
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Additions tie into the existing roof
Permit is to convert the attached garage into finished heated space at a single detached…
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A new Linwood single detached dwelling.
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A new Dundee I30C single detached dwelling with an attached garage and deck in the rear…
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A new Hawkesville D36D single detached dwelling with an attached garage and finished…
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Additions tie into the existing roof
A shed at the rear of a single detached dwelling
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Additions tie into the existing roof
A deck at the rear of a single detached dwelling
Mississauga · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
(1) level underground parking garage for (5) stacked townhouse blocks (152 units)
Oakville · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Additions tie into the existing roof
Construction of below grade entrance walkup in side yard.
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Roof, dormer or storey addition
Proposal for addition by interior alterations to existing attic and convert to new third…
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal for demolishing existing building to construct new 4-storey Fourplex
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Roof, dormer or storey addition
Proposal for rear second floor extension and a third floor addition, interior alterations…
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
PROPOSED TWO STOREY REAR YARD GARDEN SUITE
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
New 2 storey garden suite
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Roof, dormer or storey addition
Proposal to legalize as-built side yard canopy and front porch roof with front garage…
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposed demolishing existing detached SFD and new construction of 3 storey fourplex
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Additions tie into the existing roof
Proposed two storey addition and alterations to the rear of the ground and second floor…
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Additions tie into the existing roof
Proposed two-storey rear addition, a new rear covered deck, a new side canopy,…
Waterloo · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Roof, dormer or storey addition
New rear yard roof structure over existing deck.
Waterloo · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Roof, dormer or storey addition
Rear yard deck no stairs