Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Oakville · Issued Oct 17, 2026 · 19 days ago
Why it’s a lead: Additions need HVAC extended to new space
40' Sewer lateral repair - Pipelining
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New dwelling needs a full HVAC system
A Ethan rental rowhouse with an attached garage. (Block G)
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New dwelling needs a full HVAC system
A Ethan rental rowhouse with an attached garage. (Block G)
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New dwelling needs a full HVAC system
A Krishna rental rowhouse with an attached garage. (Block G)
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New dwelling needs a full HVAC system
A Krishna rental rowhouse with an attached garage. (Block G)
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New dwelling needs a full HVAC system
A Krishna rental rowhouse with an attached garage. (Block G)
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New dwelling needs a full HVAC system
A Krishna rental rowhouse with an attached garage. (Block G)
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Additions need HVAC extended to new space
Permit is to convert the attached garage into finished heated space at a single detached…
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New dwelling needs a full HVAC system
A new Linwood single detached dwelling.
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New dwelling needs a full HVAC system
A new Dundee I30C single detached dwelling with an attached garage and deck in the rear…
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New dwelling needs a full HVAC system
A new Hawkesville D36D single detached dwelling with an attached garage and finished…
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Additions need HVAC extended to new space
A shed at the rear of a single detached dwelling
Kitchener · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Additions need HVAC extended to new space
A deck at the rear of a single detached dwelling
Mississauga · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New dwelling needs a full HVAC system
(1) level underground parking garage for (5) stacked townhouse blocks (152 units)
Oakville · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Additions need HVAC extended to new space
Construction of below grade entrance walkup in side yard.
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposal for addition by interior alterations to existing attic and convert to new third…
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Proposal for demolishing existing building to construct new 4-storey Fourplex
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposal for rear second floor extension and a third floor addition, interior alterations…
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New dwelling needs a full HVAC system
PROPOSED TWO STOREY REAR YARD GARDEN SUITE
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New dwelling needs a full HVAC system
New 2 storey garden suite
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Proposed demolishing existing detached SFD and new construction of 3 storey fourplex
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposed two storey addition and alterations to the rear of the ground and second floor…
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: Additions need HVAC extended to new space
Proposed two-storey rear addition, a new rear covered deck, a new side canopy,…
Toronto · Issued Oct 16, 2026 · 20 days ago
Why it’s a lead: HVAC equipment mentioned
Proposed fire damage restoration for structural, HVAC and plumbing