Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Permits at the stage when roofing & gutters work usually starts.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Toronto · Issued Sep 28, 2026 · 38 days ago
⏱ Likely ready now
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal to demolish the existing detached dwelling and construct a new three storey…
Burlington · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: Additions tie into the existing roof
Single Detached Dwelling: Addition
Burlington · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: Additions tie into the existing roof
Single Detached Dwelling: Addition
Cambridge · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Residential Building: Single Detached, new
Cambridge · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: Roof, dormer or storey addition
Residential Deck/Porch: Roof Only, new
Kitchener · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A new Arlo single detached dwelling with an attached garage and finished basement.
Toronto · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: Additions tie into the existing roof
Proposal for interior alteration, secondary unit in the basement and rear addition.
Toronto · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: Roof, dormer or storey addition
Proposal for a new 2nd storey addition, south side and east side additions, and walkout…
Toronto · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: Additions tie into the existing roof
Proposal for second floor addition. (77.75sqm) and interior alterations to convert SFD…
Toronto · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: Additions tie into the existing roof
Proposed a second floor over existing structure and over the new garage, adding new unit…
Toronto · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: Roof, dormer or storey addition
Installation of a 57.0 kW DC / 60.0 kW AC rooftop solar photovoltaic system: 100…
Toronto · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: New build needs eavestroughs, gutters and roofing
PROPOSED DEMOLISH EXISTING DETACHED SFD AND CONSTRUCT NEW 3 STORY SIX-PLEX INCLUDING TWO…
Toronto · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: Roof, dormer or storey addition
PROPOSED THIRD FLOOR ADDITION (58 SQ.M.), INTERIOR ALTERATIONS (91 SQ.M.), NEWREAR DECK…
Toronto · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal for 2 storey detached 2 unit dwelling with integral garage, rear deck and front…
Toronto · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: Additions tie into the existing roof
Rear Yard House Addition and Interior Renovation
Toronto · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal to demo existing house to construct new 2 Storey detached SFD.
Toronto · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: Additions tie into the existing roof
Interior alterations to the basement and first floor of a mixed-use building, including…
Toronto · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: Additions tie into the existing roof
Addition And renovation
Toronto · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal to demolish existing garage and construct a new detached 1 storey garage.
Vaughan · Issued Sep 25, 2026 · 41 days ago
⏱ Likely ready now
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposed Single Detached Dwelling finished basement for personal use EP-26 129061…
Cambridge · Issued Sep 24, 2026 · 42 days ago
⏱ Likely ready now
Why it’s a lead: Roof, dormer or storey addition
Residential Deck/Porch: Deck-With Roof, new
Kitchener · Issued Sep 24, 2026 · 42 days ago
⏱ Likely ready now
Why it’s a lead: Additions tie into the existing roof
A new 1 storey single bay garage at a semi-detached dwelling
Kitchener · Issued Sep 24, 2026 · 42 days ago
⏱ Likely ready now
Why it’s a lead: Additions tie into the existing roof
Replacement of an uncovered deck with stairs at a rowhouse
Mississauga · Issued Sep 24, 2026 · 42 days ago
⏱ Likely ready now
Why it’s a lead: Roof, dormer or storey addition
Roof truss repair above garage & second floor