Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Mississauga · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New dwelling needs a full HVAC system
New (1) storey pool cabana & pergola in rear yard w/ attached shed including new rear deck
Mississauga · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New dwelling needs a full HVAC system
(2) storey detached dwelling with finished basement
Mississauga · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New dwelling needs a full HVAC system
(2) storey detacehd dwelling with finished basement
Mississauga · Issued Oct 30, 2026 · 5 days ago
Why it’s a lead: New dwelling needs a full HVAC system
New (2) storey detached dwelling w/ fin bsmt bsmt walkout and rear yard covered patio
Mississauga · Issued Oct 29, 2026 · 6 days ago
Why it’s a lead: Additions need HVAC extended to new space
(1) storey rear addition interior alterations front & rear porch new roof
Mississauga · Issued Oct 28, 2026 · 7 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Convert existing detached garage in rear yard into a garden suite
Mississauga · Issued Oct 27, 2026 · 8 days ago
Why it’s a lead: New dwelling needs a full HVAC system
(2) storey detached dwelling w/ finished basement
Mississauga · Issued Oct 27, 2026 · 8 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Revision to bp 25-10351 - fire damage restoration rebuild superstructure & rear yard…
Mississauga · Issued Oct 26, 2026 · 9 days ago
Why it’s a lead: Additions need HVAC extended to new space
(1) storey rear add. W/ increase in building height front & rear porches int. Alts.…
Mississauga · Issued Oct 22, 2026 · 13 days ago
Why it’s a lead: Additions need HVAC extended to new space
New unheated sunroom addition in rear yard and demo of existing deck
Mississauga · Issued Oct 21, 2026 · 14 days ago
Why it’s a lead: Additions need HVAC extended to new space
New heated add. In rear yard & 2nd flr int alts on main & 2nd flr res 2nd unit in bsmt…
Mississauga · Issued Oct 21, 2026 · 14 days ago
Why it’s a lead: HVAC equipment mentioned
Revision to permit 24-1580 - new air handler hvac system - block a (6 units)
Mississauga · Issued Oct 21, 2026 · 14 days ago
Why it’s a lead: HVAC equipment mentioned
Revision to permit 25-9571 - new hvac system installation (2) furnaces
Mississauga · Issued Oct 20, 2026 · 15 days ago
Why it’s a lead: New dwelling needs a full HVAC system
Fire damage reconstruction of superstructure and basement bldg #12 - unit #13
Mississauga · Issued Oct 20, 2026 · 15 days ago
Why it’s a lead: HVAC equipment mentioned
Revision to permit 25-10762 - hvac installation (2) furnaces
Mississauga · Issued Oct 16, 2026 · 19 days ago
Why it’s a lead: New dwelling needs a full HVAC system
(1) level underground parking garage for (5) stacked townhouse blocks (152 units)
Mississauga · Issued Oct 14, 2026 · 21 days ago
Why it’s a lead: New dwelling needs a full HVAC system
(2) storey detached dwelling w/ finished basement
Mississauga · Issued Oct 14, 2026 · 21 days ago
Why it’s a lead: New dwelling needs a full HVAC system
New detached garage in rear yard & (2) new pergolas
Mississauga · Issued Oct 13, 2026 · 22 days ago
Why it’s a lead: Additions need HVAC extended to new space
2nd storey heated addition above garage
Mississauga · Issued Oct 9, 2026 · 26 days ago
Why it’s a lead: New dwelling needs a full HVAC system
New detached garage in rear yard
Mississauga · Issued Oct 8, 2026 · 27 days ago
Why it’s a lead: Additions need HVAC extended to new space
Basement & ground flr add in rear yard 2nd flr add garage front expansion (1) new…
Mississauga · Issued Oct 8, 2026 · 27 days ago
Why it’s a lead: Additions need HVAC extended to new space
2nd storey addition to existing interior alterations on ground floor & finished basement
Mississauga · Issued Oct 6, 2026 · 29 days ago
Why it’s a lead: New dwelling needs a full HVAC system
New (2) storey detached dwelling w/ fin bsmt bsmt walkout rear covered porch & demo of…
Mississauga · Issued Oct 5, 2026 · 30 days ago
Why it’s a lead: Additions need HVAC extended to new space
Basement & second floor addition in rear yard (1) new heated addition over garage int…